settings
Critical Path Learning Center
Unisex printed tee
Price
Options
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Add to Cart
Sizing Details
Size Guide
| S | M | L | XL | 2XL | 3XL | 4XL | 5XL | |
|---|---|---|---|---|---|---|---|---|
| Body Length | 17 1/4 | 19 1/4 | 21 1/4 | 23 1/4 | 25 1/4 | 27 1/4 | 29 1/4 | 31 1/4 |
| Body Width | 28 | 29 | 30 | 31 | 33 | 34 | 35 | 36 |
Shipping
Shipping
Beyond The Seams has a highly developed production and shipping system and we make every effort to ship your order in a fast and effecient manner.
Pays attention to every “feel good” detail and has a tag-free design, so no more scratchy neck tags.
- 6.0 oz., pre-shrunk 100% ComfortSoft cotton; Charcoal Heather, Oxford Grey, Safety Green and Safety Orange are 60/40
- TAGLESS for ultimate comfort
- Shoulder-to-shoulder taping with converstitched collar
- Double-needle stitched armholes and sleeves
- Lay-flat collar
View Description
Hide Description


