settings
Critical Path Learning Center
Unisex printed hoodie
*Design may appear smaller in graphic than actual print
Price
Options
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Add to Cart
Sizing Details
Size Guide
| S | M | L | XL | 2XL | 3XL | 4XL | 5XL | |
|---|---|---|---|---|---|---|---|---|
| Body Length | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
| Body Width | 20 | 22 | 24 | 26 | 28 | 30 | 32 | 34 |
| Sleeve Length | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 |
Shipping
Shipping
Beyond The Seams has a highly developed production and shipping system and we make every effort to ship your order in a fast and effecient manner.
NuBlend pill-resistant fleece, double-needle stitched at stress points for long wear.
- 8.0 oz., 50/50 cotton/polyester
- Seamless body with set-in sleeves
- 1x1 rib collar, cuffs and waistband with spandex
- Double-needle stitched at stress points
- Front pouch pocket
- Two-ply hood with grommets and drawstring
- Concealed seams on cuffs
View Description
Hide Description


