settings
Critical Path Learning Center
Unisex printed sweatshirt
Price
Options
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Add to Cart
Sizing Details
Size Guide
| S | M | L | XL | 2XL | 3XL | 4XL | 5XL | |
|---|---|---|---|---|---|---|---|---|
| Across Shoulders | 19.5 | 21.5 | 23.5 | 25.5 | 27.5 | 29.5 | 31.5 | 33.5 |
| Body Length | 26.5 | 27.5 | 28.5 | 29.5 | 30 | 30.5 | 31 | 31.5 |
| Chest Width | 20 | 22 | 24 | 26 | 28 | 30 | 32 | 34 |
| Sleeve Length | 24 3/8 | 24 5/8 | 24.25 | 24 | 23.75 | 23.5 | 23.25 | 23 |
Shipping
Shipping
Beyond The Seams has a highly developed production and shipping system and we make every effort to ship your order in a fast and effecient manner.
- 7.8 oz./yd², 50/50 US grown cotton/polyester
- The polyester content is currently transitioning to CiCLO® polyester
- Patented, low-pill, high-stitch density PrintPro® XP fleece
- Double-needle stitched neckline and armholes
- Ribbed cuffs and waistband
- Transitioning to tear away label
View Description
Hide Description


