settings
Critical Path Learning Center
Printed tote
Price
Options
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Add to Cart
Sizing Details
Size Guide
| ONE SIZE | |
|---|---|
| Length Tolerance | +/- 1 |
| Measurements | 20"W x 15"H x 5"D |
| Pocket Size - Interior | 6 1/2" x 6 1/4" |
| Suggested Imprint Area | 14"W x 10"H |
| Width Tolerance | +/- 1 |
Shipping
Shipping
Beyond The Seams has a highly developed production and shipping system and we make every effort to ship your order in a fast and effecient manner.
- 12 oz./yd² (US), 20 oz/L yd (CA), 100% heavy cotton canvas
- Large main compartment with zippered closure, approximately 18"
- Inside zippered flap pouch pocket
- 25" self-fabric handles
- 11" handle drop
- Bottom gusset
Natural color is not a dyed fabric, what you are seeing are fibers and cotton seeds.
View Description
Hide Description


